Saturday 21 April 2012

Week 14 : Presentation Day / Engineer's Day for UniKL BMI (S1/2012)


Week No : 14                                                                                                         Date : 24/4/2012

Title of Activity : Presentation Day / Engineer's Day for UniKL BMI (S1/2012)

Objective :
1) To present the project on the Engineer's Day.
2) To get the evaluation & marks about the project from the assessors.

Content / Procedure :
1) The details about the Engineer's Day for UniKL BMi session S1/2012 :
    Day : Tuesday
    Date : 24th April 2012
    Venue : Foyer TTL / Dewan Gemilang Hall
    Time : 12.00 pm - 5.00 pm

2) Get the turn to be evaluated from the assessor according to the listed number in RPS.

Result and Analysis :
1) The event is conducted by the committees of FYP.
2) All the progress of event going well & smooth.

Conclusion :
1) The winner for the top 20th of project is announced on the end of event and the competition will be proceed on Thursday ( 26/4/2012 ).
2) Final progress is submitted the final report of project and finished up the progress of blog.

Thursday 19 April 2012

Week 13 : Complete poster & blog for FYP S1/2012


Week No : 13                                                                                                          Date : 19/4/2012

Title of Activity : Complete poster & blog for FYP S1/2012

Objective :
1) To design the poster of smart phototherapy.
2) To complete up the progress of blog for FYP session S1/2012

Content / Procedure :
1) Design the poster by using Microsoft Power Point.
2) The contains of poster including the brief of smart phototherapy ( abstract, methodology, results, analysis, conclusion , & etc ).
3) Complete up the blog progress ; which is starting from Week 1 until Week 14.

Result and Analysis :
1) The poster will be used during the presentation on the Engineering's Day that will be held on 24th April 2012.
2) It also used as the ' additional method ' to explain brief & details to the assessors besides using the power point slide and prototype about what's the smart phototherapy about.

Conclusion :
1) It will give the easiest way to tell the readers about the smart phototherapy.
2) To enhance a little bit of knowledge about relationship between combination of medical and electronic concepts.


PICTURE OF POSTER for SMART PHOTOTHERAPY


Saturday 7 April 2012

Week 11 : Result of the core temperature

Week No : 11                                                                                                          Date : 5/4/2012

Title of Activity : Result of the core temperature (38oC ).

Objective :
1) To figure out the suitable result for the end of actual core temperature.
2) To determine the design of temperature graph.
3) To complete up for the final progress of project.

Content / Procedure :
1) All the hardware & software parts are combine altogether.
2) The LM35 is used as heat sensor to detect the changing of temperature.
3) Testing part will be occurred by using 2 bulbs and 3 bulbs. The tables for both results will be constructed.
4) By setting up the  ambient temperature (Ta) with starting of 26C. Then, the setting point (S.P) button will be pushed to increase the temperature. Thus, the differences of emitting light happened on the bulbs. 
5) Then, the results from the difference type of bulbs ( 2 bulbs / 3 bulbs ) will be graphed on the graph of temperature.
6) Analyse from the both results.

Result and Analysis :
1) Result & graph result of temperature in smart phototherapy by using 2 bulbs.
















                     Figure 1 : Result & graph result of temperature in smart phototherapy by using 2 bulbs


The ambient temperature (Ta) is set with (26C). It took 7 seconds to increase to (27C). From 0 second to 44seconds, the PWM circuit gives a 100% in performance of duty cycle.
The set point of temperature (S.P) is (37C). 
At (30C), the PWM circuit stabilizes the heat produced by bulbs by changing the performance of duty cycle at 90% and 50%.
 



2)  Result & graph result of temperature in smart phototherapy by using 3 bulbs.





                 Figure 2 : Result & graph result of temperature in smart phototherapy by using 3 bulbs


The ambient temperature (Ta) during experimenting was (26C). It took 8 seconds to increase to (27C). From 0 second to 40seconds, the PWM circuit gives a 100% in performance of duty cycle.
- The set point of temperature (S.P) is (37C).
At (30C), the PWM circuit stabilizes the heat produced by bulbs by changing the performance of duty cycle at 90% and 50%.

3) Results on the Pulse Width Modulation (PWM)





Figure 3 : Results on the Pulse Width Modulation (PWM) 




100% performance of duty cycle : Refer to the Figure 3, at this stage, the temperature increase until 30C which is 7C before the set temperature in 40seconds.
90% performance of duty cycle : Refer to Figure 3, the temperature will increase until it reaches at the set point temperature, 37C. This increment is happened in 112 seconds. At this stage, the PWM circuit will turn to 50% of duty cycle’s performance.

50% performance of duty cycle : At this stage, the PWM circuit controls the heat produce either in 50% or 0% (cut-off) to maintain the temperature at 38C in the compartments.


Conclusion :
1) The LM35 is chose to be a heat sensor because of it generates a higher output voltage and proportional to the Celsius (oC) temperature.
2) Regarding on the graph in Figure 1, it shows that there is no overshoot temperature when using 2 bulbs.
3) Regarding on the graph in Figure 2 , it shows that there is an overshoot temperature when using 3 bulbs. The overshoot was in (2C) over the set temperature. When the temperature was (2C) more than set temperature, the PWM circuit will cut off and no heat was produced by bulb. The temperature decreased to set temperature.
4) The PWM method is used because of it is able to control the heat produced by the heat elements in percentage, 100%, 90% or 50%.

Thursday 29 March 2012

Week 10 : Design the hardware

Week No : 10                                                                                                    Date : 29/3/2012

Title of Activity : Design the hardware

Objective :
1) To find & select a suitable components.
2) To design the project hardware.
3) To complete the project objective.

Content / Procedure :
1) Make research about the component that suitable for the project.
2) Research about how to design the project.
3) Build the ' smart phototherapy ' hardware by using the component listed.
4) Tested the hardware.

Result and Analysis :
1) Design assumption hardware that compatible to this project.
2) There are consisted of 2 compartments :
    - The heat element is located at the below compartment.
    - The above compartment is the area to measure the temperature which is the temperature sensor is located at this part.
3) Specification component in hardware :
     a) LM35 heat sensor
     b) Cooler fan 12V for air circulation.
     c) Bulb 100W as heat element.

a) LM35 DZ heat sensor
- A precision integrated-circuit temperature sensor,where the output voltage is linearly proportional to the (oC) temperature.


b) Cooler fan 12V.
- Cooler fan has been used to absorb the heat produced at below compartment.
- At the center of compartment, there is one divider where located 12V cooler fan and air circulation hole.


c) Bulb 100W as heat element.
- Normal cap cool day light bulb and has standard wattage 100W.
- This bulb produce heat till (80 oC) in a few seconds.
- Produces a soft and gentle ambient light. Plus, has an ability to produce and diffuse more heat through its light.


Conclusion :
1) This project involved 2 major section : hardware & software.
2) In the hardware part, a prototype of ' smart phototherapy ' is built with a temperature sensor, controller board and pulse width modulation (PWM) circuit.




PICTURE & DIAGRAM



Thursday 22 March 2012

Week 9 : PIC program and testing of the project.

Week No : 9                                                                                                 Date : 22/3/2012

Title of Activity : PIC program and testing of the project.

Objective :
1) To design the flow of the process for the project.
2) To learn how to burn the program.
3) To combine between hardware part & software part.

Content / Procedure :
1) Design the process of the project objective.
2) Write the program in MPLAB IDE software.
3) Burn the IC and test the program.
4) The program must suitable with hardware compartment function.

Result and Analysis :
1) The program conversions from analog to digital.
2) Set the value should be same with the actual temperature in ' smart phototherapy ' incubator.
3) The program should include PWM concept when the system is running to control the heat produced by heat element.
4) Produces heat either 100% , 90% or 50%.
5) The program shows the LCD initializes before the result will be displayed on the LCD.

Conclusion :
The MPLAB IDE is used because of it is the highly optimized compilers for the PIC18 series micro-controllers, high performance PIC24 MCUS, dsPIC digital signal controller and PIC32 MX MCUS.


FLOW CHART & PICTURE






a) Figure shows the flow chart of PIC program process.




















b) Figure shows the program been testing using PIC controller board & PWM circuit.

Friday 9 March 2012

Week 7 : PIC controlled board & PWM circuit board.

Week No : 7                                                                                                 Date : 8/3/2012

Title of Activity : PIC controlled board & PWM circuit board.

Objective :
1) To estimate the controlled board looks alike.
2) To control the heat by using PWM method.

Content / Procedure :
1) List down all the control component.
2) Draw the circuit in PCB lab and print out the circuit.
3) Hatching the circuit regarding on that had setting in the PCB lab layout.
4) Solder the component on the circuit board.
5) Test the circuit.

Result and Analysis :
1) The controlled board consist of :
     - programmable integrated circuit (PIC)
     - a power rectifier AC to DC
     - LCD (16x2)
     - push button
   All these elements will be attached to the board.
2) Power rectifier function to convert alternate current (AC) to direct current (DC) by using transformer step down (240V/9V) as main supply for control board.
3) Push button as selected menu & LCD to display temperature & receive the decoded signal from PIC.
4) PWM will receive decoded signal from PIC to control the heater,where it more like switch for heater.
5) The main component in this circuit is MOC3041M, where this device consists of infrared emitting diode optically coupled to monolithic silicon detector performing the function of zero voltage crossing bilateral triac drives. It's designed for use with a triac in the interface of logic system to equipment powered from 240V AC lines such as solid relay.

Conclusion :
1) The controlled board need to design more specific & functional, so that to make it run smoothly.
2) PWM circuit need to functional because it's control the temperature that created by the bulbs.


PROCESS OF CONTROLLER BOARD CIRCUIT of PWM & PIC.






a) Step 1 : Figure shows the PWM circuit in PCB board layout.








b) Step 2 : Figure shows the PWM controller board circuit in hatching process by using acid.










c) Step 3 : Figure shows the PWM controller board circuit after hatching.














d) Step 4 : Figure shows the components in soldering progress on the PIC controller board circuit.









FINAL PICTURE


Figure shows the combination of PIC controller board & pulse width modulation (PWM) circuit  board altogether.


Wednesday 29 February 2012

Week 6 : Air circulation and make power supply 240V , transformer 9V/0.2A.

Week No : 6                                                                                            Date : 1/3/2012

Title of Activity : Air circulation and make power supply 240V , transformer 9V/0.2A.

Objective :
1) To make the air circulation is at the maximum.
2) To design the power supply for 240V.
3) To convert the power supply from 240V to 9V dc.

Content / Procedure :
1) Searching the information from the internet.
2) Getting the information about the air circulation.
3) Know the air circulation function.
4) Design the power supply using socket outlet 13A.
5) Convert the voltage using transformer 9V/0.2A.

Result and Analysis :
1) The air circulation can be occurred as a result of a heat air movement in a different air pressure are going to up and move down.
2) The air movement occurs because the atmosphere heating is not distributed evenly.
3) The air moves from the relatives chilled & high pressured area to the relative warm & low pressured area.

a) Socket outlet 13A.
- Shall be of 3 rectangular pin, has life,neutral and earth prongs. 
- The plug has a fuse inside that required to protect the cord of wires.

b) Transformer 9V/0.2A.
- Step down the voltage 240V to 9V/0.2A.
- A power supply is a device that supplies electrical energy to one or more electric loads.
- The terms is commonly applied to devices that converted to one form of electrical energy to another, through it may also refer to devices that convert another energy form to electrical energy.

Conclusions :
1) To circulate the air effectively, absorb fan should be used. The type of absorb fan is depending on the quantity of circulated air and the speed to circulate air.
2) Every power supply must be obtained the energy it supplies to its load as well as any energy it consumes while performing that task from an energy sources.

PICTURES & DIAGRAM.



a) Figure shows the socket outlet 13 Ampere.
















b) Figure shows the transformer 9V/0.2A.











c) Figure shows the power supply for socket outlet 13A, transformer 9V/0.2A and adapter.